Our Team
Our staff brings unparalleled value to each project by providing the right team of professionals with extensive experience, education and expertise.
Michael J. Griffin, PE
Griffin has over 35 years of experience that includes a diverse background in the design, evaluation, and remediation of buildings and equipment for extreme loads resulting from earthquake and wind hazards. As a recognized expert in structural assessment and mitigation design for building and nonstructural components to earthquake hazards, Griffin instructs FEMA courses for the National Earthquake Technical Assistance Program (NETAP), including:
- ATC-20, Post-Earthquake Safety Evaluation of Buildings
- FEMA 74, Earthquake Hazard Mitigation of Nonstructural Components
- FEMA P-154, Rapid Visual Screening of Buildings for Potential Seismic Hazards
- FEMA P-749, Earthquake-Resistant Design Concepts
- FEMA P-909, Home and Business Earthquake Safety and Mitigation
Griffin has over 35 years of experience that includes a diverse background in the design, evaluation, and remediation of buildings and equipment for extreme loads resulting from earthquake and wind hazards. As a recognized expert in structural assessment and mitigation design for building and nonstructural components to earthquake hazards, Griffin instructs FEMA courses for the National Earthquake Technical Assistance Program (NETAP), including:
- ATC-20, Post-Earthquake Safety Evaluation of Buildings
- FEMA 74, Earthquake Hazard Mitigation of Nonstructural Components
- FEMA P-154, Rapid Visual Screening of Buildings for Potential Seismic Hazards
- FEMA P-749, Earthquake-Resistant Design Concepts
- FEMA P-909, Home and Business Earthquake Safety and Mitigation
Alan W. Blair, Jr., PE
Blair has 40 years of experience providing construction management services including project management, owner's representation, and cost estimating. Since joining CCS Group in 1998, Blair has been responsible for managing CCS Group's
K-12 and religious facility projects. He has managed the design, bidding, and construction phases of projects of varying levels of complexity, from re-roofing and mechanical upgrades to the construction of new facilities.
Blair has 40 years of experience providing construction management services including project management, owner's representation, and cost estimating. Since joining CCS Group in 1998, Blair has been responsible for managing CCS Group's
K-12 and religious facility projects. He has managed the design, bidding, and construction phases of projects of varying levels of complexity, from re-roofing and mechanical upgrades to the construction of new facilities.
Victoria M. Winn
Winn has 15 years of experience that encompasses a broad range of engineering activities related to understanding the response of structures to extreme loading, including seismic, wind, blast, and progressive collapse hazards. Winn has extensive experience working with seismic evaluation standards, including ASCE 41-17 / 41-13 / 41-06 and FEMA P-154.
Her experience includes evaluation and strengthening designs for a wide range of building types and performance objectives. Nonstructural evaluations and strengthening projects have ranged from standard office occupancies to specialized facilities, such as data centers, hospitals, water and waste water treatment plants, hydroelectric power plants, electric substations, LNG storage facilities, pharmaceutical manufacturing, and distilleries.
Winn has 15 years of experience that encompasses a broad range of engineering activities related to understanding the response of structures to extreme loading, including seismic, wind, blast, and progressive collapse hazards. Winn has extensive experience working with seismic evaluation standards, including ASCE 41-17 / 41-13 / 41-06 and FEMA P-154.
Her experience includes evaluation and strengthening designs for a wide range of building types and performance objectives. Nonstructural evaluations and strengthening projects have ranged from standard office occupancies to specialized facilities, such as data centers, hospitals, water and waste water treatment plants, hydroelectric power plants, electric substations, LNG storage facilities, pharmaceutical manufacturing, and distilleries.